From 1 - 2 / 2
  • At each CTD station the Fast Repetition Rate Fluorometer (FRRF) was carried out onto the trawl deck and shackled (+ cable tie) to the winch cable. When the crew in the aft control room were ready the PAR (Photosynthetically Active Radiation) cap was removed and the FRRF activated with the magnet. It was deployed at a rate of 0.3m/sec to 10m, stopped for 30sec, then the descent was continued to 100m at same rate where it was stopped for another 30 sec. The FRRF was then brought back up at 0.3m/sec to deck. Once on deck the FRRF was turned off, it was hosed down with hot fresh water and the PAR cap replaced. Underway data were collected from the flow-through system in the lab on all South/North transects. West to East legs were not surveyed. The FRRF data were downloaded after every Vertical Drop and at the end of the Underway legs. The post-processing and analysis of data will be carried out after the voyage. The Final dataset is in the form of a Binary file for each drop and Underway leg. This work was completed as part of ASAC projects 2655 and 2679 (ASAC_2655, ASAC_2679).

  • FRRF deployments were conducted at 22 sites in conjunction with ship stop times when the CTD was deployed. See event log for locations. Some underway FRRF sampling was conducted on the return voyage. This work was conducted as part of the VMS (Voyage Marine Science) voyage of the Aurora Australis in the 2010-2011 season. A report providing further details about the FRRF work is available as part of the download file. The download file also contains a word document (also included in the download file for metadata record ASAC_1307) explaining the data columns in the excel spreadsheets.